Skip to content
Your Bhoomi

Land Security · Sample report

See what you receive after every inspection

Below is an anonymized sample of the report our field representative sends after a physical land security check. Names, location, and findings are illustrative. A downloadable sample PDF is coming.

YOURBHOOMI LAND SECURITY REPORT

Bhoomi Watch (quarterly) · Warangal, Telangana

SAMPLE
Property:
Sample: family plot
Location:
Warangal, Telangana
Inspection:
12 Aug 2026, 10:40 AM IST
Field representative:
Ravi K.
Report ID:
YB-SR-SAMPLE-001
GPS verification:
Verified
Overall statusAmber: Attention Required

Plot is intact and boundary stones are in place. Two items need attention: the north fence has sagged near the road, and a neighbour has stacked construction material against the east boundary. No unauthorized construction observed.

Inspection checklist

  • Boundary conditionOKAll four boundary stones located and photographed. No visible shift since last visit.
  • Fence conditionAttentionNorth fence sagging over ~6 m near the road; two posts loose. Repair recommended before monsoon.
  • Access roadOKKutcha road motorable; no obstruction at the gate.
  • Encroachment observationAttentionNeighbour has stacked bricks and sand against the east boundary. Not on the plot; monitor at next visit.
  • Unauthorized constructionOKNone observed on the plot.
  • Existing structuresOKName-board present and legible. No sheds or huts.
  • VegetationAttentionKnee-high growth across the plot; clearing recommended so boundaries stay visible.
  • WaterloggingOKDry on inspection day; low south-west corner noted for monsoon check.
  • SignageOK‘Private property — Your Bhoomi monitored’ board in place.
  • Caretaker statusOKLocal contact met on site; confirmed no visitors or activity since last inspection.
  • Neighbour activityAttentionConstruction underway on the adjacent east plot. Watch for material spill-over.
  • Tax / document remindersOKProperty tax paid for FY 2026-27. Next Pahani/1B check due Oct 2026.

Evidence

18 geo-tagged photos · 1 video walkthrough

  • Photos: geo-tagged, timestamped, all four corners plus fence and east boundary.
  • Video: walkthrough, 2 min 40 s, boundary to boundary.
  • Captured 10:40–11:25 AM IST, 12 Aug 2026.
  • GPS coordinates recorded with each photo (rounded and withheld in this sample).
  • For recurring customers, each report shows the same corners side by side with the previous visit.

Recommendations

Immediate

  • Repair north fence (two posts, re-tension wire). Vendor quote can be arranged for your approval.
  • Send a polite written notice to the east neighbour about material stacked against the boundary; we can deliver it in person.

Optional

  • Clear vegetation before monsoon so boundary stones remain visible.
  • Add one more name-board on the east side facing the neighbour’s construction.
Follow-up:
26 Aug 2026 (fence repair confirmation)
Next inspection:
Nov 2026 (quarterly schedule)

Share securely with family

Reports are shared privately with you and anyone you name (family, your lawyer). They are never indexed or made public. (Sharing buttons are shown for illustration in this sample.)

This is an informational indicator based on the answers/observations provided. It is not a legal title certification or legal opinion. A field inspection records what is visible on the ground on the day of the visit; it does not verify ownership, title, or survey boundaries.

What every report contains

  • Overall status: Green (Secure), Amber (Attention Required) or Red (Immediate Action Recommended)
  • 12-point checklist: boundary, fence, access, encroachment, construction, structures, vegetation, waterlogging, signage, caretaker, neighbours, tax and records
  • Geo-tagged, timestamped photos of every corner plus a video walkthrough
  • Before/after comparison against your previous visit (recurring plans)
  • Immediate and optional recommendations with a follow-up date and next inspection date
  • Private delivery on WhatsApp, email, or a secure link — never indexed or public